Roof Shingle Calculator

Count shingle bundles from roof size, slope, waste and manufacturer coverage.

Enter your values

Result

27
Roof area
75.8333333333
Roofing squares
8.98
Bundles
27
Shingles
594
Underlayment rolls
3
Ridge packs
2
Estimated cost
918 USD
Need help with your result? Ask a question about your inputs or calculation. Ask AI
0 / 2000
20 requests per day · resets at 00:00 UTC

When to use Roof Shingle Calculator

Count shingle bundles from roof size, slope, waste and manufacturer coverage.

Explore layout dimensions and material needs for a roof or stair configuration matching the selected model.

How to use this tool

  1. Enter the inputs listed below. Follow the field format, and select units beside each supported quantity.
  2. Results update automatically. Review the main result and its breakdown. Use Clear to enter a new scenario.
  • Roof length
  • Roof width
  • Rise per 12
  • Waste (%)
  • Bundle coverage
  • Roll coverage
  • Ridge length
  • Ridge coverage per pack
  • Shingles per bundle
  • Bundle price

How it works

Multiply the horizontal footprint by the pitch factor and apply waste. Divide by the labeled coverage for bundles, underlayment and ridge packs.

Worked example

The examples below use fixed sample inputs. They explain the calculation and do not change when you edit the tool above.

Roof length
10 m
Roof width
7 m
Rise per 12
5
Waste (%)
10
Bundle coverage
3.1 m²
Roll coverage
36 m²
Ridge length
10 m
Ridge coverage per pack
6 m
Shingles per bundle
22
Bundle price
34
Result
27
Roof area
75.8333333333 m²
Roofing squares
8.98
Bundles
27
Shingles
594
Underlayment rolls
3
Ridge packs
2
Estimated cost
918 USD

Understanding the result and its limits

Geometry does not prove code compliance, safe loading or constructability. Verify supports, connections, openings and local requirements separately.

Frequently asked questions

Does a dimensioned layout guarantee a compliant design?

No. A drawing or numeric result must also satisfy the applicable building requirements and project-specific engineering.

Methodology and references

Use the formulas and assumptions above when interpreting the example. Any practical estimate depends on the accuracy of the inputs.