Post Hole Concrete Calculator

Estimate concrete for post holes after subtracting the embedded posts.

Enter your values

Result

0.0489852834511
Net volume
0.0445320758646
Bags
3
Estimated cost
5.63 USD
Need help with your result? Ask a question about your inputs or calculation. Ask AI
0 / 2000
20 requests per day · resets at 00:00 UTC

When to use Post Hole Concrete Calculator

Estimate concrete for post holes after subtracting the embedded posts.

Estimate placement volume, bag counts or mix quantities before confirming the specification with a supplier.

How to use this tool

  1. Choose the calculation mode that matches your task and the information you have.
  2. Enter the inputs listed below. Follow the field format, and select units beside each supported quantity.
  3. Results update automatically. Review the main result and its breakdown. Use Clear to enter a new scenario.
  • Hole diameter
  • Height
  • Post diameter
  • Quantity
  • Waste (%)
  • Bag yield
  • Price per volume
  • Hole width
  • Hole length
  • Post cross-section

How it works

Round hole
Subtract the circular post area from the circular hole area. Multiply by depth and hole count.

Worked example

The examples below use fixed sample inputs. They explain the calculation and do not change when you edit the tool above.

Round hole

Hole diameter
30 cm
Height
0.75 m
Post diameter
12 cm
Quantity
1
Waste (%)
10
Bag yield
17 L
Price per volume
115 USD/m³
Result
0.0489852834511 m³
Net volume
0.0445320758646 m³
Bags
3
Estimated cost
5.63 USD

Rectangular hole

Hole width
30 cm
Hole length
30 cm
Height
0.75 m
Post cross-section
0.0144 m²
Quantity
1
Waste (%)
10
Bag yield
17 L
Price per volume
115 USD/m³
Result
0.06237 m³
Net volume
0.0567 m³
Bags
4
Estimated cost
7.17 USD

Understanding the result and its limits

Yield, site tolerances and mix design vary. Calculated volume or ingredient ratios do not establish concrete strength or suitability.

Frequently asked questions

Can I order exactly the theoretical volume?

Check site dimensions, placement losses and supplier requirements first. Any allowance must be explicit rather than assumed.

Methodology and references

Use the formulas and assumptions above when interpreting the example. Any practical estimate depends on the accuracy of the inputs.