When to use Brick Calculator
Plan the brick purchase for a rectangular wall or a known gross wall area. Deduct windows and doors, choose one or two leaves, and compare the order quantity with your supplier’s price.
The drawing separates the wall dimensions L and H from the brick face l × h, the brick width w and joint thickness t. Width changes the mortar-volume estimate, while the face dimensions determine bricks per wall area.
How to use this tool
- Choose Wall length and height or Enter wall area. Enter gross dimensions first, then subtract the combined area of openings.
- Select Single leaf or Double leaf. Enter actual brick dimensions, excluding mortar, and set the joint thickness with its own unit selector.
- Set a brick allowance and an optional unit price. Results update automatically when the entries are complete.
- To estimate mortar, select Yes under Estimate mortar materials. Enter your volume factor, mortar allowance, cement:sand proportion, density, bag size and optional prices.
- Wall length (L)
- Wall height (H)
- Openings area
- Wall type
- Brick length (l)
- Brick height (h)
- Brick width (w)
- Mortar joint thickness (t)
- Brick waste (%)
- Price per brick (USD) (optional)
- Estimate mortar materials
- Dry-to-wet volume factor
- Mortar waste (%)
- Cement-to-sand ratio
- Loose cement density
- Cement bag mass
- Price per cement bag (USD) (optional)
- Sand price per volume (optional)
- Gross wall area
How it works
Wall length and height
Net area A equals gross wall area minus openings. With n brick leaves, the theoretical brick count is A × n ÷ ((l + t) × (h + t)). Round up the theoretical count after applying the brick waste percentage to get the order quantity. Double leaf means two separate brick leaves, excluding the cavity. Mortar volume is the solid wall-envelope volume minus the unrounded volume of placed bricks; it excludes the cavity and collar joints. Multiply wet mortar by your dry-volume factor and mortar allowance, then divide the dry ingredients by the selected cement:sand volume ratio. Cement mass uses loose bulk density; bag count is rounded up.
Enter wall area
Net area A equals gross wall area minus openings. With n brick leaves, the theoretical brick count is A × n ÷ ((l + t) × (h + t)). Round up the theoretical count after applying the brick waste percentage to get the order quantity. Double leaf means two separate brick leaves, excluding the cavity. Mortar volume is the solid wall-envelope volume minus the unrounded volume of placed bricks; it excludes the cavity and collar joints. Multiply wet mortar by your dry-volume factor and mortar allowance, then divide the dry ingredients by the selected cement:sand volume ratio. Cement mass uses loose bulk density; bag count is rounded up.
Worked example
The examples below use fixed sample inputs. They explain the calculation and do not change when you edit the tool above.
Wall length and height
- Wall length (L)
- 6 m
- Wall height (H)
- 2.5 m
- Openings area
- 2 m²
- Wall type
- Single leaf
- Brick length (l)
- 19.4 cm
- Brick height (h)
- 5.7 cm
- Brick width (w)
- 9.2 cm
- Mortar joint thickness (t)
- 10 mm
- Brick waste (%)
- 10
- Price per brick (USD)
- 0.9
- Estimate mortar materials
- No
- Result
- 1,047
- Bricks before waste
- 952
- Extra bricks in order
- 95
- Net wall area
- 13 m²
- Brick leaves
- 1
- Brick cost
- 942.3 USD
Known wall area with mortar materials
- Gross wall area
- 15 m²
- Openings area
- 2 m²
- Wall type
- Single leaf
- Brick length (l)
- 19.4 cm
- Brick height (h)
- 5.7 cm
- Brick width (w)
- 9.2 cm
- Mortar joint thickness (t)
- 10 mm
- Brick waste (%)
- 10
- Price per brick (USD)
- 0.9
- Estimate mortar materials
- Yes
- Dry-to-wet volume factor
- 1.33
- Mortar waste (%)
- 10
- Cement-to-sand ratio
- 1:5
- Loose cement density
- 1,440 kg/m³
- Cement bag mass
- 50 kg
- Price per cement bag (USD)
- 8
- Sand price per volume
- 55 USD/m³
- Result
- 1,047
- Bricks before waste
- 952
- Extra bricks in order
- 95
- Net wall area
- 13 m²
- Brick leaves
- 1
- Brick cost
- 942.3 USD
- Wet mortar volume
- 0.228384547849 m³
- Dry material volume with waste
- 0.334126593503 m³
- Cement volume
- 0.0556877655838 m³
- Sand volume
- 0.278438827919 m³
- Cement mass
- 80.1903824407 kg
- Cement bags
- 2
- Cement cost
- 16 USD
- Sand cost
- 15.31 USD
- Total material cost
- 973.61 USD
Understanding the result and its limits
This is an area-based quantity estimate for regular stretcher-face brickwork. It does not lay out courses or specify a structural wall. Corners, piers, bond patterns and cuts can change quantities. A double-leaf estimate counts two brick layers; insulation, ties, the cavity and mortar between leaves are excluded.
The mortar calculation treats bricks as solid rectangular envelopes. It does not fill holes or frogs, and it assumes consistent joints. The dry-volume factor and loose cement density are editable assumptions. Cement:sand proportions are for estimating ingredients only; they are not ASTM mortar types or a recommendation for the project. Labor, transport, tax and unlisted materials are excluded.
Frequently asked questions
How many bricks are needed per square meter?
For one leaf, divide 1 m² by (brick length + joint) × (brick height + joint), using meters. Multiply by two for two leaves. There is no universal count because brick sizes and joints differ.
Is the allowance applied before or after rounding?
The order is rounded up after applying the allowance to the theoretical count. The separate before-waste count is rounded up for display. Mortar uses unrounded placed volume, so spare bricks do not add mortar.
Can I enter the net area directly?
Yes. Select Enter wall area, enter the net area and set Openings area to zero. Otherwise openings would be subtracted twice.
Do I have to enter prices?
No. Empty price fields are treated as zero. Quantity estimates still work, but the displayed costs include only prices you supplied.
Methodology and references
Use the formulas and assumptions above when interpreting the example. Any practical estimate depends on the accuracy of the inputs.